Comprehending BIM Clash Detection & Making It Efficient

In the realm of Building Information Modeling, BIM clash detection facilitates in identifying clashes during the design and preconstruction stage. The action fits in a constructability analysis to find issues that are left unchecked and can lead to difficulties, cost overrun, and productivity loss in the actual stage of construction. Architects, Engineers, and Construction professionals can access clash detection in various software applications, like NavisWorks, Tekla BIM sight, Solibri Model Checker, ArchiCAD, Revit, and many more.

What Constitutes to be a BIM Clash Test?

A test constitutes to be a predefined set of components that need to be checked for collisions. Usually, there are two sorts of validations – interconnecting as well as clearance check, seldom called “soft check”. An interconnecting clash constitutes to be a collision of the geometries of two substances. Usually, a clearance check stands for a collision amongst a predefined buffer around the geometry of two objects. The buffer gets established in some clash detection software applications or modeled in the BIM object for mechanical equipment maintenance. This is also operated for the clearance of door access, stair run, precast concrete panel installation, steel truss deflection, and much other stuff.

The ideal way is to plan a clash test and create what is usually called the “clash matrix” for delineating blends of disciplines and precedence grounded on construction schedule and deliverable. The chronology of the BIM clash test is significant to reduce repetitions between model updates.

What is BIM Clash Rule Formula?

A clash rule formula is used to choose particular objects necessary to be incorporated in a clash test. It is vital to check the uniformity of the model tree in case the clash regulation is to select an object. A competent way to create the naming convention of an object and parameters is using the Industry Foundation Classes (IFC) for model sharing. Further, a clash rule encompasses Boolean expressions like and/or, or specific exclusion standards.

What is BIM Clash Report Document?

A BIM clash report happens to be a document shared with AEC project stakeholders on a specified project through PDF, HTML, XML, or additional formats. The document constitutes to be a “conventional” method of allocating issues established within the clash detection software application and demands some additional time for setting up, tracking, and solving problems over time.

How to Assign the Issues Competently through BIM?

A ‘traditional’ report is not an effective method of data transfer to the users in the modeling software where the concerns need to be resolved. However, the BIM Collaboration Format constitutes to be an open format that helps to save the time of a user in finding the place of clashes or the pre-requisite time essential to obtain an apt view while moving from one software platform to the other. BIM Collaboration Format happens to be the key for optimizing the clash detection process and must be used by the BIM Modelers or the BIM Engineers undertaking clash detection. Further, platforms are focusing on conflict tracking like BIM Track to facilitate issue transfer through various phases.

The Way to Fix a BIM Clash

A technique of reducing common place BIM modeling tasks results in detecting loads of clashes for script-based modeling automation resolutions like Dynamo. To take an instance, if you have an HVAC system through a fire-rated panel and want to add a special accessory at this place, you can use Dynamo for placing the accessories automatically at the locations and create an opening in the wall mechanically in Revit.

Another growing trend is using clash-free auto-routing with a computational design like GenMEP. The essential facet of GenMEP is the ability to use algorithms for routing MEP systems without clashes mechanically during the design development stage.

The crux of the Matter – Improved Clash Coordination will lead to Better Buildings

Clash detection existed for a long time but what makes it valuable is the BIM dimension that you define around it. Using out-of-the-box software applications is not an ideal solution for the timely resolution of an issue without substantial effort. Find out the common issues encountered on-site, set clash tests consequently, and then check BIM models for specific cases.

Detect your clash at the right moment and as per your construction schedule before the onset of the construction workflow through 3D BIM Modeling. Improved clash coordination through BIM will lead to better coordination and better building.

To know more about Revit BIM Clash Detection services, talk to the BIM Modeling Engineers of Tejjy Inc. at [email protected] or 202-465-4830.